Skip to main content

Repair work will close Stillwater lift bridge from mid-September through end of year

A $3.6 million project that starts September 10th will keep the bridge out of commission for four months and will disrupt some of the boat traffic on the St. Croix.
  • Author:
  • Updated:
    Original:

A $3.6 million project that starts September 10th will keep the bridge out of commission for four months and will disrupt some of the boat traffic on the St. Croix.

Next Up

2019_0914_Packers_Away_0419

What happens to the Vikings if Aaron Rodgers leaves the NFC North?

Rodgers said he isn't interested in rebuilding in Green Bay, is it time for the Vikings to pounce or stay the course?

ambulance

Sheriff: Men found unresponsive in garage died of cocaine overdose

Two of the three men found unresponsive in an Eyota garage last week died of a drug overdose, a preliminary autopsy found.

Anthony Edwards

Ant's injury clouds Timberwolves' victory over the Nets

The Timberwolves star was injured in the final minutes on Sunday night.

Akoya Lee

Byron native Ayoka Lee sets NCAA record for points in a game

The Kansas State forward broke a record shared by former Gopher Rachel Banham.

cold, wind chill, freezing

It's going to be stupid cold again Tuesday and Wednesday

They'll almost certainly be the 10th and 11th days with subzero temps this month.

Williams Uptown Pub

Williams Uptown Pub & Peanut Bar closes indefinitely after shooting

Reports say police have arrested two suspects in the incident.

Alex Rodríguez

A-Rod wears a Packers hat, Minnesotans lose their minds

The Timberwolves co-owner didn't endear himself to his fan base on Saturday night.

Flickr - Minneapolis police squad - Chad Davis

Police: Man shoots into crowd at funeral reception in Minneapolis

The shooting happened at a reception following a funeral on Saturday afternoon.

Related

Stillwater Lift Bridge about month from reopening

Drivers will once again be able to cross the Stillwater Lift Bridge in about a month. The bridge, which connects Minnesota and Wisconsin across the St. Croix River, closed Sept. 10 for the rehabilitation project.

MnDOT: Construction on new St. Croix River bridge to begin next spring

MnDOT officials tell MPR that foundation work on the new bridge crossing the St. Croix River downstream from Stillwater will begin next spring, rather than in 2014. The proposed four-lane bridge connecting Minnesota and Wisconsin will replace the 80-year-old Stillwater Lift Bridge. The entire project is estimated to cost up to $676 million and take about three years to complete.

Stillwater Lift Bridge to close for 4 months

The Stillwater Lift Bridge will close Monday for four months while MnDot crews make repairs. The bridge will not reopen until late December. The lift span will open to boat traffic on Sundays from Oct. 15 through Nov. 5 and will also not open again until late December.

Three-month shutdown of Stillwater bridge is glimpse of future

The Stillwater lift bridge is shutting down Monday for three months of repairs. Many in the city find it a relief to be freed from the traffic congestion of Wisconsin commuters. Some consider it a preview of what life will be like once a new St. Croix River bridge opens in Oak Park Heights in another four or five years.

New St. Croix River bridge sails through Senate

The U.S. Senate unanimously authorized construction of a new St. Croix River bridge near Stillwater. The move comes after 15 years of debate over how to improve traffic flow while also protecting the St. Croix, which is a National Scenic River.